Construction of a second-generation pilot plant for the manufacturing of blasting agents The project and its challenges Nexco has developed, through laboratory testing, an ammonium nitrate powder for the manufacturing of blasting agents for use in the mining industry.... Read more
Publication date 28 July 2016
Evaluation assessments for the construction of a smelter for the production of magnesium from tailings of serpentine rock The project and its challenges Alliance Magnesium has developed an innovative technology for the extraction of magnesium, one that is cleaner and... Read more
Publication date 28 July 2016
Increasing the capacity of a thermal power plant (36 MW) The project and its challenges Bouygues Energies & Services, a large French engineering and construction company, submitted a tender in 2013 for a major energy project: the design-build of a 36 MW thermal... Read more
Publication date 28 July 2016
Major modification to a hydrometallurgical process The project and its challenges As their traditional sources of zinc concentrate were dwindling, the Client had to make a strategic investment in metallic zinc produced from alternative sources to maintain the... Read more
Publication date 28 July 2016
Demonstration plant for the removal of CO2 from flue gases The project and its challenges CO2 Solutions is a company that specializes in enzymatic carbon capture technology. Their patented innovative technology allows for the separation and concentration of CO2 from... Read more