Construction of a second-generation pilot plant for the manufacturing of blasting agents The project and its challenges Nexco has developed, through laboratory testing, an ammonium nitrate powder for the manufacturing of blasting agents for use in the mining industry.... Read more
Evaluation assessments for the construction of a smelter for the production of magnesium from tailings of serpentine rock The project and its challenges Alliance Magnesium has developed an innovative technology for the extraction of magnesium, one that is cleaner and... Read more
Increasing the capacity of a thermal power plant (36 MW) The project and its challenges Bouygues Energies & Services, a large French engineering and construction company, submitted a tender in 2013 for a major energy project: the design-build of a 36 MW thermal... Read more
Major modification to a hydrometallurgical process The project and its challenges As their traditional sources of zinc concentrate were dwindling, the Client had to make a strategic investment in metallic zinc produced from alternative sources to maintain the... Read more
Demonstration plant for the removal of CO2 from flue gases The project and its challenges CO2 Solutions is a company that specializes in enzymatic carbon capture technology. Their patented innovative technology allows for the separation and concentration of CO2 from... Read more
Archives
- December 2022 (1)
- September 2022 (1)
- April 2022 (2)
- July 2021 (1)
- December 2020 (1)
- June 2020 (5)
- May 2020 (2)
- November 2018 (1)
- October 2017 (1)
- June 2016 (2)
- Seneca 2024
- all rights reserved